Now accepting early access

Your next
takeoff
in minutes.

Upload your electrical plans. takeoff.ai counts every downlight, GPO, exit light and switchboard — then hands you a SimPro-ready bill of quantities.

6h
Saved per takeoff vs manual
<2min
Average processing time
98%
Symbol detection accuracy
0x
Manual recounts needed

Drop a PDF.
Get your BQ.

  1. 1

    Ingest your drawings

  2. 2

    Auto scale detection

  3. 3

    AI symbol recognition

  4. 4

    Linear measurement

  5. 5

    Luminaire schedule matching

  6. 6

    Human review + export

processing_log.sh
> INGEST: plans_level_3.pdf [OK]
> DETECT_SCALE: Reading legend... Found 1:100 [OK]
> SYMBOL_DETECTION: Running vision model...
↳ Found D1: 1,284
↳ Found GPO: 347
↳ Found Exit: 62
> WARN: 3 low-confidence symbols flagged for human review.
> MEASURE: Tracing linear runs...
↳ Cable Tray (CT1): 247.3 lm
Compiling BQ
100%
> DONE: Finished in 1m 47s.

Built for how sparkies work.

Any format

PDF & image ingestion

Upload flattened PDFs, scans, or images. If you can read it, our AI can read it.

Zero manual input

Auto scale detection

We automatically detect the drawing scale from legends or known dimensions. Set and forget.

Novel symbols flagged

AI symbol recognition

Our vision model detects and tallies thousands of electrical symbols in seconds, no matter the draftsperson's style.

Lineal metres

Linear measurement

Automatically measures cable tray, trenching, and conduit lengths directly off the page.

Auto-matched

Luminaire schedule parsing

We read the legend schedule and automatically cross-reference IDs (e.g. D1) to descriptions.

SimPro native

SimPro-ready export

Export a clean, fully-formatted CSV ready to import directly into SimPro without lifting a finger.

Ready for
SimPro.

Everything your estimator needs, formatted exactly how SimPro expects it. No reformatting. No copy-paste. No mistakes.

  • Symbol code + description automatically joined
  • Precise grouped quantities
  • Page-by-page references
  • Inline confidence flags on edge cases
  • Integrated human review step for peace of mind
BQ_Level3_Electrical_v1.xlsx
Code Description Qty Unit Conf.
D1 Recessed LED Downlight 1,284 ea High
GPO Double 10A DGPO 347 ea High
EX1 LED Exit Sign 62 ea High
CT1 Cable Tray 300mm 247 m High
L2 Linear Pendant 18 ea Review
"A senior estimator doing a full commercial takeoff manually — that's a whole day, sometimes two. If this thing does it in two minutes and gets it right, that's not a tool. That's a competitive advantage."
BR
Early access tester
Electrical contractor, Melbourne VIC

Stop counting.
Start winning.

Join the waitlist. Be first in line when we launch.
Electricians only — no agencies, no resellers.

Free during beta. No card required.